25kV Rubber Glove Work Rules Final Nov 2016
72kV and 138kV Live Line Hotstick Rules
Apply and Remove Protective Grounding in a Switching Station
De-energizing Primary Underground Cable
Digger Derrick – Install a Power-Installed Screw Anchor
Digger Derrick – Load and Unload a Wood Pole
Digger Derrick – Set Wood Pole – De-Energized or New
Digger Derrick – Set Wood Pole – Energized
Digger Derrick and Pole Puller – Pull Wood Pole – De-Energized
Digger Derrick and Pole Puller – Pull Wood Pole – Energized
Digger Derrick or Boom Truck – Make a Lift – SGL Winch Line
District Substation End to End
Felling Trees Within Fallover Distance of Energized Lines
Field Care for Live Line Hotsticks
Field Inspection and Testing of Temporary Bonds and Grounds
Ground Grids Repairing Connecting and Disconnecting
Handling, Transportation and Temp. Storage of Oil-Filled Equip Containing PCBs
Hardware Tightening on Overhead Structures – Alive State
Helicopter Long Line Operations
Helicopter Orientation – Transportation of Personnel
High Voltage Center Break Switch Operation Inspection
High Voltage End Break Switch Operation Inspection
High Voltage Ground Switch and Interlock Operation Inspection SOP
Identification of Underground Cables using the VCI-3
Identify Oil-Filled Equipment Containing PCBs
In Service Dielectric Stick Testing
Install and Operate Mobile Transformers
Instrument Transformer Rated Meter Exchange – Energized State
Isolate Overhead Transformers – Maintenance and PCB Test
MHAD or Aerial Device – Perform Bucket Dump
MHAD-Aerial Device – Perform Boom Lowering-No Upper Controls
Mobile Equipment – Perform Pre-Operational Equipment Checks
Mobile Equipment – Perform Pre-Trip Air Inspections
Mobile Equipment – Perform Pre-Trip Chassis Inspections
Operation of 3-Phase OCR with 3-Way Bypass
Operation of Single-Phase OCR with 3-way Bypass
PCBs Disposal of Equipment Containing PCBs
Primary Underground Cable Injection
Rigid Protective Cover Work Rules
Secondary Underground – New Installation
Self Contained Socket Type Meter Exchange Less than 300V-Energized
Self Contained Socket Type Meter Exchange Less than 300V-Isolated
Self-Contained Meter Exchange above 300V-Isolated State Non Oilfield
Splicing Operations on Primary Radial Underground Cables
Standard Protection Code – Maintenance of T and D Authorized List
Straighten Poles in the Alive State Procedure
T and D – Inspect Use and Maintain Bond Mats
Testing for Absence of Potential
Transmission and Distribution Dedicated Observer