• Skip to main content

Hundseth Power Line Construction

  • Home
  • About
  • Services
  • News
  • Contact Us
  • Safety
  • Careers
  • Leadership

SaskPower SOP

25kV Rubber Glove Work Rules Final Nov 2016

72kV and 138kV Live Line Hotstick Rules

Apply and Remove Protective Grounding in a Switching Station

De-energizing Primary Underground Cable

Digger Derrick – Dig a Hole

Digger Derrick – Install a Power-Installed Screw Anchor

Digger Derrick – Load and Unload a Wood Pole

Digger Derrick – Set Wood Pole – De-Energized or New

Digger Derrick – Set Wood Pole – Energized

Digger Derrick and Pole Puller – Pull Wood Pole – De-Energized

Digger Derrick and Pole Puller – Pull Wood Pole – Energized

Digger Derrick or Boom Truck – Make a Lift – SGL Winch Line

District Substation End to End

Felling Trees Within Fallover Distance of Energized Lines

Field Care for Live Line Hotsticks

Field Inspection and Testing of Temporary Bonds and Grounds

Ground Grids Repairing Connecting and Disconnecting

Handling, Transportation and Temp. Storage of Oil-Filled Equip Containing PCBs

Hardware Tightening on Overhead Structures – Alive State

Helicopter Long Line Operations

Helicopter Orientation – Transportation of Personnel

High Voltage Center Break Switch Operation Inspection

High Voltage End Break Switch Operation Inspection

High Voltage Ground Switch and Interlock Operation Inspection SOP

Identification of Underground Cables using the VCI-3

Identify Oil-Filled Equipment Containing PCBs

In Service Dielectric Stick Testing

Install and Operate Mobile Transformers

Instrument Transformer Rated Meter Exchange – Energized State

Isolate Overhead Transformers – Maintenance and PCB Test

Jack Jumper Demonstration

Megger Thumper

MHAD – Make a Lift

MHAD or Aerial Device – Perform Bucket Dump

MHAD-Aerial Device – Perform Boom Lowering-No Upper Controls

Mobile Equipment – Perform Pre-Operational Equipment Checks

Mobile Equipment – Perform Pre-Trip Air Inspections

Mobile Equipment – Perform Pre-Trip Chassis Inspections

Operation of 3-Phase OCR with 3-Way Bypass

Operation of Single-Phase OCR with 3-way Bypass

PCB Fire Procedure

PCBs Disposal of Equipment Containing PCBs

Pole Top Fire

Primary Underground Cable Injection

Rigid Protective Cover Work Rules

Secondary Underground – New Installation

Self Contained Socket Type Meter Exchange Less than 300V-Energized

Self Contained Socket Type Meter Exchange Less than 300V-Isolated

Self-Contained Meter Exchange above 300V-Isolated State Non Oilfield

SOP Process – End to End

Splicing Operations on Primary Radial Underground Cables

Standard Protection Code – Maintenance of T and D Authorized List

Stations Trenching

Straighten Poles in the Alive State Procedure

Switching Operations

T and D – Inspect Use and Maintain Bond Mats

Testing for Absence of Potential

Transmission and Distribution Dedicated Observer

UAV – Unmanned Aerial Vehicle

Vehicles and Equipment – Wheel Care – Lug Torque

VON Thumper Operation

White Lining

Working in Cold Conditions

Working in Hot Conditions

Working Near Lightning

Working on Ice

Working On In or Near Water